Certero Surveys
Certero Surveys
  • Home
  • Services
    • Aerial Mapping
    • Engineering Surveys
    • Project Quantities
    • Machine Guidance
  • Projects
  • Contact
  • More
    • Home
    • Services
      • Aerial Mapping
      • Engineering Surveys
      • Project Quantities
      • Machine Guidance
    • Projects
    • Contact
Get in Touch
  • Home
  • Services
    • Aerial Mapping
    • Engineering Surveys
    • Project Quantities
    • Machine Guidance
  • Projects
  • Contact
Get in Touch

Hope Downs 1 - Hope Downs 4 Pipeline

Project Overview

The HD pipeline project is located between Hope Downs 1 & Hope Downs 4 mine site primarily along RTIO rail line, Western Australia.


The project area to provide LiDAR aerial mapping surveys is a combination of brown & green fields with unsealed access tracks and light vegetation. The aerial mapping survey area extents was 60km long corridor, approximately 6,000 Ha.


Certero Surveys was engaged by Rio Tinto – Sustaining Capital to fly the areas of interest to capture topographic data to support the pre-feasibility study phase and design of the HD Pipeline.


The primary data capture was completed with a DJI M350 RTK & DJI Zenmuse L2 LiDAR sensor, capturing RGB imagery & point cloud of the site. The aerial point cloud and imagery was processed to derive an accurate 3D ground profile (50mm vertical accuracy) and orthomosaic of site using LiDAR and photogrammetric procedures. 

Project Details

Location

Pilbara, WA


Client

Rio Tinto


Status

Completed 2025

Request A Quote

Copyright © 2025 Certero Surveys - All Rights Reserved.

  • Aerial Mapping
  • Engineering Surveys
  • Project Quantities
  • Machine Guidance
  • Projects
  • Contact

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept